22MG23.11.08J.05 Coal mill nozzle moving ring

Product Details
Customization: Available
Certification: ISO
Color: Customized
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • 22MG23.11.08J.05 Coal mill nozzle moving ring
  • 22MG23.11.08J.05 Coal mill nozzle moving ring
  • 22MG23.11.08J.05 Coal mill nozzle moving ring
  • 22MG23.11.08J.05 Coal mill nozzle moving ring
  • 22MG23.11.08J.05 Coal mill nozzle moving ring
  • 22MG23.11.08J.05 Coal mill nozzle moving ring
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
22MG23.11.08J.05
Customized
Customized
Standard
National
Type
Connection
Material
Alloy
Industry
Power Plants
Condition
Brand New
Usuage
Coal Mill
System
Hydraulic Oil Station
Transport Package
Wooden Box
Specification
Customized
Trademark
Customized
Origin
China
Production Capacity
10000 Pieces/Year

Packaging & Delivery

Package Size
30.00cm * 30.00cm * 30.00cm
Package Gross Weight
5.000kg

Product Description

Product Description
 
When using the Coal mill nozzle dynamic ring 22MG23.11.08J.05, first pay attention to correct installation and adjustment. Before installing the nozzle dynamic ring, the static ring of the nozzle should be installed first, and ensure that the removable part of the support is correctly installed to the roller gate of the middle frame, but do not wedge it for the time being. Next, use a gasket to adjust the static ring of the nozzle so that it is in a horizontal state. After installing the nozzle dynamic ring, carefully adjust the gap between the dynamic ring and the static ring, measure the gap with a feeler gauge and record its gap value, and ensure that the gap between the dynamic ring and the static ring is uniform at about 5mm. Too large or too small a gap will affect the normal operation of the coal mill, so be extra careful when adjusting.

During the operation of the coal mill, it is necessary to strengthen the monitoring of the nozzle nozzle dynamic ring 22MG23.11.08J.05. The nozzle dynamic ring will be eroded by the primary wind and worn by the coal powder, so the wear of the nozzle dynamic ring should be checked regularly. Excessive wear will affect the ventilation flow rate, resulting in an increase in the discharge of stone coal, which will affect the efficiency and stability of the coal mill. At the same time, the wind speed and wind pressure of the primary wind should be monitored to ensure that they are within a reasonable range. Too high or too low wind speed and wind pressure will have an adverse effect on the nozzle dynamic ring. Too low wind speed may cause the coal powder to fail to be blown out in time, while too high wind speed will aggravate the wear of the equipment.

Maintenance and replacement are the key links to ensure the normal operation of the nozzle dynamic ring. When the nozzle dynamic ring is severely worn, it is necessary to replace it with a new one in time to avoid abnormal operation of the coal mill due to excessive wear. When replacing the integral nozzle ring, the separator and pressure device need to be disassembled. This process should be done carefully to avoid damage to other parts. In addition, some anti-wear measures can be taken to extend the service life of the nozzle dynamic ring, such as wear-resistant treatment on the surface of the nozzle dynamic ring, or adding anti-wear lining to the nozzle dynamic ring to reduce wear.
 
Technical parameters of coal mill
Heat generation: 1631MJ/kg
Surface moisture:< 18%
Grindability system: HGI=4080
Combustible volatile matter: 1640%
Raw coal particles: 040mm
Fineness of coal powder: R90=240%
 
Product Features:

1. Reliability: Adopting high-quality bearing support and replaceable stationary wear rings.

2. Efficiency: The dual suction design improves suction efficiency.

3. Flexibility: Suitable for various industrial and municipal fields.

4. Stability: Maintain a high degree of sealing during operation, without leakage.

5. Maintainability: replaceable stationary wear rings and well-designed lubrication system.
 
Application:
Thermal power plants: Coal mills are used to grind coal into powder for better combustion and power generation.
Steel plant: Coal mills are used for the preparation of coal powder, helping to improve combustion efficiency.
Cement plant: Coal mills are used for the preparation of coal powder to ensure the smooth progress of cement production.
In the field of coal chemical industry, medium speed coal mills can be used in coal to oil, coal to fertilizer, coal to natural gas and other process flows to provide qualified coal powder.
 
Related Products:

Mandrel DTPD100UZ025
Assembling the main bearing U140D00
link U250\51010
Sealing ring pressure ring DG600-240-03-16
Gasket U152Y13
Spacer DTYD30UZ006
Internal thread cylindrical pin GB0000120G1695
blade DTPD60UG001
Sealing sleeve TY9106C
Filter Elements MG30.21.30.01
Loading cylinder seal 21MG40.11.14.02
Accumulator Bladder NXQ1-L1.6/20-H-HT
Cone Washer GB0000850W0016
Elastic pin coupling YI35556
Cylinder connecting rod DTYD100UI002
Connection card set 21MG20.11.13.02
Hydraulic reversing valve MG.00.11.19.01
Roller-disc grinding limit plate K28121.6.6
Medium speed mill rotary separator drive unit 10MG50.11.15X.09
Medium speed mill rotary separator slewing bearing 10MG50.11.15X.06.88





 
Detailed Photos

22MG23.11.08J.05 Coal mill nozzle moving ring

22MG23.11.08J.05 Coal mill nozzle moving ring22MG23.11.08J.05 Coal mill nozzle moving ring22MG23.11.08J.05 Coal mill nozzle moving ring

 

Packaging & Shipping

          Standard & solid packaging ensures your goods safety.

22MG23.11.08J.05 Coal mill nozzle moving ring

          Various professional packages at your choice
22MG23.11.08J.05 Coal mill nozzle moving ring

         Multiple choice of reliable and cost-effective shipping methods available.
22MG23.11.08J.05 Coal mill nozzle moving ring
 
Company Profile

- ABOUT US -

Dongfang Yoyik Engineering Co., Ltd is located in Deyang, Sichuan, China's heavy equipment base, was founded in 2004. The company is a professional power plant spare parts manufacturer and supplier. Our products are applicable for many thermal power plants, hydropower plants, metallurgic industrial power plant, cement plant power house, aluminum plant power house, and coal mill power plants.

22MG23.11.08J.05 Coal mill nozzle moving ring
From advanced precision electric elements and components to highly-customized metal items, you can find all the needed for a power plant from Yoyik.


Yoyik is the exclusive agent of W.M. Nugent CO Inc for selling Nugent filter elements and filtration system products in China. The company also has great advantages in of many hydraulic products, including pumps, valves, sealing materials, etc.
22MG23.11.08J.05 Coal mill nozzle moving ring
 
Our Advantages

 

- TECHNICAL PATENTS -

22MG23.11.08J.05 Coal mill nozzle moving ring
 

- OUR ADVANTAGE -

22MG23.11.08J.05 Coal mill nozzle moving ring


- COOPERATIVE INDUSTRIES -

Yoyik offers wide range of spare parts for customers in different industries:
 
22MG23.11.08J.05 Coal mill nozzle moving ring
FAQ

- ORDER NOTES -

√ Model Selection
Before purchasing, please ensure that the model specifications you provide are complete or that the drawings have been drawn so that you can provide timely and accurate quotations.

√ Quality Assurance
We promise to provide high-quality products and after-sales service. If there are any quality issues, please contact us promptly.

√ Secure Transactions
We sell on MIC, provide a secure and reliable trading environment, and accept multiple payment methods to facilitate your purchase.

 

- FAQ -

- Are you trading company or manufacturer?
We are factory located in Deyang, China.

- How long is your delivery time?
Generally it is 2-5 days if the goods are in stock. Or it is 7-21 days if the goods are not in stock, it is according to quantity.

- Do you provide samples? Is it free or extra?
Sorry we do not offer samples.

- What price terms do you accept?
Our company can accept all trading manners, eg. EXW, FOB, CIF etc

- What payment terms do you accept?
We accept T/T.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier