21MG30.11.05 Coal mill hydraulic slag discharge door assembly

Product Details
Customization: Available
Certification: ISO
Color: Customized
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • 21MG30.11.05 Coal mill hydraulic slag discharge door assembly
  • 21MG30.11.05 Coal mill hydraulic slag discharge door assembly
  • 21MG30.11.05 Coal mill hydraulic slag discharge door assembly
  • 21MG30.11.05 Coal mill hydraulic slag discharge door assembly
  • 21MG30.11.05 Coal mill hydraulic slag discharge door assembly
  • 21MG30.11.05 Coal mill hydraulic slag discharge door assembly
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
21MG30.11.05
Customized
Customized
Standard
National
Type
Connection
Material
Alloy
Industry
Power Plants
Condition
Brand New
Usuage
Coal Mill
System
Hydraulic Oil Station
Transport Package
Wooden Box
Specification
Customized
Trademark
Customized
Origin
China
Production Capacity
10000 Pieces/Year

Packaging & Delivery

Package Size
30.00cm * 30.00cm * 30.00cm
Package Gross Weight
5.000kg

Product Description

Product Description
 
The hydraulic slag discharge door assembly 21MG30.11.05 of the coal mill is a key device used to control the slag discharge process in the coal mill. Its main function is to control the opening and closing of the slag discharge door through the hydraulic system during the operation of the coal mill to discharge impurities such as stone coal generated inside the coal mill.

The hydraulic slag discharge door assembly 21MG30.11.05 usually includes a slag discharge door, a hydraulic cylinder, a connecting flange, a sealing plate and other components. The slag discharge door is composed of a door plate, a frame plate and a sealing plate stacked together. There is a spring pressure structure between the frame plate and the sealing plate to ensure that the sealing plate can tightly press the door plate to prevent impurities from entering. The hydraulic cylinder is responsible for providing power and controlling the opening and closing of the slag discharge door through the hydraulic system. When slag discharge is required, the hydraulic cylinder pushes the slag discharge door open to allow impurities such as stone coal to be discharged smoothly; after the slag discharge is completed, the hydraulic cylinder closes the slag discharge door to ensure the sealing inside the coal mill.

In addition, the hydraulic slag discharge door assembly also has a certain anti-blocking function. During the slag discharge process, slag particles may accumulate at the bottom of the slag discharge door, causing the door plate to get stuck. To this end, some designs have added anti-blocking components, such as moving parts, buffer parts and protective parts, to prevent slag accumulation and ensure that the slag discharge door can be closed normally. This design not only improves the slag discharge efficiency, but also reduces the number of coal mill shutdowns caused by slag discharge door failures, ensuring the stable operation of the coal mill.
 
Technical parameters of coal mill
Heat generation: 1631MJ/kg
Surface moisture:< 18%
Grindability system: HGI=4080
Combustible volatile matter: 1640%
Raw coal particles: 040mm
Fineness of coal powder: R90=240%
 
Product Features:

1. Reliability: Adopting high-quality bearing support and replaceable stationary wear rings.

2. Efficiency: The dual suction design improves suction efficiency.

3. Flexibility: Suitable for various industrial and municipal fields.

4. Stability: Maintain a high degree of sealing during operation, without leakage.

5. Maintainability: replaceable stationary wear rings and well-designed lubrication system.
 
Application:
Thermal power plants: Coal mills are used to grind coal into powder for better combustion and power generation.
Steel plant: Coal mills are used for the preparation of coal powder, helping to improve combustion efficiency.
Cement plant: Coal mills are used for the preparation of coal powder to ensure the smooth progress of cement production.
In the field of coal chemical industry, medium speed coal mills can be used in coal to oil, coal to fertilizer, coal to natural gas and other process flows to provide qualified coal powder.
 
Related Products:

Accumulator Bladder MG30.21.03.01
Final guide vane FT10QA38M-04-02
Main bearing assembly DTPD100UI003
Roller 20MG23.11.09J.18
Nuts GB0006170C0020
Condensate pump mechanical seal NLT350-400*6
Radial bearings YOT46-508-10-01
Electric hydraulic pump PFG211
Mechanical seal cover FA1D56-03-01
Medium speed planetary carrier grinding JX12.10.02.08G
Servo valve AP1-26/14TY9112
Medium speed wear-resistant sleeve 200MG31.11.23.98
Double suction impeller HZB200-430-01-03
O-Ring DG600-240-07-01(8)
Booster fanUType seal TU790105
Oil flow sight glass DN25 F520299000018YZQ-2
Medium speed wear-resistant sleeve 20MG50.11.23.96
Medium speed grinding ceramic lining 300MG31.11.08.98STC-JK





 
Detailed Photos

21MG30.11.05 Coal mill hydraulic slag discharge door assembly

21MG30.11.05 Coal mill hydraulic slag discharge door assembly21MG30.11.05 Coal mill hydraulic slag discharge door assembly21MG30.11.05 Coal mill hydraulic slag discharge door assembly

 

Packaging & Shipping

          Standard & solid packaging ensures your goods safety.

21MG30.11.05 Coal mill hydraulic slag discharge door assembly

          Various professional packages at your choice
21MG30.11.05 Coal mill hydraulic slag discharge door assembly

         Multiple choice of reliable and cost-effective shipping methods available.
21MG30.11.05 Coal mill hydraulic slag discharge door assembly
 
Company Profile

- ABOUT US -

Dongfang Yoyik Engineering Co., Ltd is located in Deyang, Sichuan, China's heavy equipment base, was founded in 2004. The company is a professional power plant spare parts manufacturer and supplier. Our products are applicable for many thermal power plants, hydropower plants, metallurgic industrial power plant, cement plant power house, aluminum plant power house, and coal mill power plants.

21MG30.11.05 Coal mill hydraulic slag discharge door assembly
From advanced precision electric elements and components to highly-customized metal items, you can find all the needed for a power plant from Yoyik.


Yoyik is the exclusive agent of W.M. Nugent CO Inc for selling Nugent filter elements and filtration system products in China. The company also has great advantages in of many hydraulic products, including pumps, valves, sealing materials, etc.
21MG30.11.05 Coal mill hydraulic slag discharge door assembly
 
Our Advantages

 

- TECHNICAL PATENTS -

21MG30.11.05 Coal mill hydraulic slag discharge door assembly
 

- OUR ADVANTAGE -

21MG30.11.05 Coal mill hydraulic slag discharge door assembly


- COOPERATIVE INDUSTRIES -

Yoyik offers wide range of spare parts for customers in different industries:
 
21MG30.11.05 Coal mill hydraulic slag discharge door assembly
FAQ

- ORDER NOTES -

√ Model Selection
Before purchasing, please ensure that the model specifications you provide are complete or that the drawings have been drawn so that you can provide timely and accurate quotations.

√ Quality Assurance
We promise to provide high-quality products and after-sales service. If there are any quality issues, please contact us promptly.

√ Secure Transactions
We sell on MIC, provide a secure and reliable trading environment, and accept multiple payment methods to facilitate your purchase.

 

- FAQ -

- Are you trading company or manufacturer?
We are factory located in Deyang, China.

- How long is your delivery time?
Generally it is 2-5 days if the goods are in stock. Or it is 7-21 days if the goods are not in stock, it is according to quantity.

- Do you provide samples? Is it free or extra?
Sorry we do not offer samples.

- What price terms do you accept?
Our company can accept all trading manners, eg. EXW, FOB, CIF etc

- What payment terms do you accept?
We accept T/T.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier