• Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
  • Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
  • Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
  • Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
  • Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
  • Gjcfl-15 Boiler Air Preheater Gap System Air Pipe

Gjcfl-15 Boiler Air Preheater Gap System Air Pipe

Type: Air Pipe
Component: Mechanical Structure Type
For: Power Plant
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe pictures & photos
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
US $680-1,360 / Piece
Min. Order: 1 Piece
Manufacturer/Factory, Trading Company
Gold Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Sichuan, China
  • Overview
  • Product Description
  • Related Products
  • Packaging & Shipping
  • Company Profile
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
GJCFL-15
Output Signal Type
Digital Type
Production Process
Normal Wirewound
Material
Plastic
Thread Type
M
Wiring Type
Three-Wire
Measuring Medium
Gas
IP Rating
IP65
Certification
ISO
Customized
Customized
Condition
New
Warranty
1year
Fuction
Gap Transmitter
Application
Air Preheater
Transport Package
Carton or Wooden Box
Specification
GJCFL-15
Trademark
Yoyik
Origin
China
Production Capacity
10000 Pieces/Year

Packaging & Delivery

Package Size
55.00cm * 25.00cm * 10.00cm
Package Gross Weight
2.300kg

Product Description

 
Product Description

The air pipe GJCFL-15 in the gap system of power plant boilers plays a crucial role in the operation of power plant boilers. Its main function is to ensure the correct proportion of air and fuel required during the combustion process of the boiler, while also effectively controlling and regulating the pressure inside the boiler. Below is a detailed introduction of its function:

 Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
Product Features:

Firstly, the GJCFL-15 air pipe introduces external air into the interior of the boiler, providing the oxygen required for combustion. This allows the fuel and air to be fully mixed to form combustible gases, which are ultimately burned inside the boiler. During the combustion process, chemical reactions occur inside the boiler, generating high-temperature and high-pressure gases that drive the turbine to rotate and generate electricity.

Secondly, the GJCFL-15 air pipe also serves as a buffer for discharging excess gas and pressure fluctuations in the boiler. When the internal pressure of the boiler is higher or lower than the preset value, the air pipe will balance the pressure through discharge or suction to maintain stable boiler pressure. In addition, when the boiler needs to be quickly loaded or unloaded, the GJCFL-15 air pipe can also respond quickly and provide the necessary air flow.
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
Applications:

In addition, the air pipe can also prevent flames from spraying out of the furnace, ensuring the safety of the boiler and surrounding equipment. In some cases, if there is a malfunction or abnormality in the combustion process, the GJCFL-15 air pipe can provide additional air volume to help the boiler quickly shut down and prevent accidents from expanding.

In summary, the function of the air pipe GJCFL-15 in the gap system of power plant boilers is to provide the air required for combustion, regulate boiler pressure, and ensure safe operation of the boiler. It is one of the important equipment to ensure the normal operation of power plant boilers.

Gjcfl-15 Boiler Air Preheater Gap System Air Pipe

Related Products

Yoyik offers different types for industrial users:

Gap Measuring Probe GJCT-15-E
Power supply GJCD-16
Packaging & Shipping

          Standard & solid packaging ensures your goods safety.

Gjcfl-15 Boiler Air Preheater Gap System Air Pipe

          Various professional packages at your choice
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe

         Multiple choice of reliable and cost-effective shipping methods available.
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
 
Company Profile

- ABOUT US -

Dongfang Yoyik Engineering Co., Ltd is located in Deyang, Sichuan, China's heavy equipment base, was founded in 2004. The company is a professional power plant spare parts manufacturer and supplier. Our products are applicable for many thermal power plants, hydropower plants, metallurgic industrial power plant, cement plant power house, aluminum plant power house, and coal mill power plants.

Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
From advanced precision electric elements and components to highly-customized metal items, you can find all the needed for a power plant from Yoyik.


Yoyik is the exclusive agent of W.M. Nugent CO Inc for selling Nugent filter elements and filtration system products in China. The company also has great advantages in of many hydraulic products, including pumps, valves, sealing materials, etc. the brands include Eaton, Vickers, Moog, star, copaltite, temp-tite, 707, etc.
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
 
Our Advantages

 

- TECHNICAL PATENTS -

Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
 

- OUR ADVANTAGE -

Gjcfl-15 Boiler Air Preheater Gap System Air Pipe


- COOPERATIVE INDUSTRIES -

Yoyik offers wide range of spare parts for customers in different industries:
 
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
FAQ

- ORDER NOTES -

√ Model Selection
Before purchasing, please ensure that the model specifications you provide are complete or that the drawings have been drawn so that you can provide timely and accurate quotations.

√ Quality Assurance
We promise to provide high-quality products and after-sales service. If there are any quality issues, please contact us promptly.

√ Secure Transactions
We sell on MIC, provide a secure and reliable trading environment, and accept multiple payment methods to facilitate your purchase.

 

- FAQ -

- Are you trading company or manufacturer?
We are factory located in Deyang, China.

- How long is your delivery time?
Generally it is 2-5 days if the goods are in stock. Or it is 7-21 days if the goods are not in stock, it is according to quantity.

- Do you provide samples? Is it free or extra?
Sorry we do not offer samples.

- What price terms do you accept?
Our company can accept all trading manners, eg. EXW, FOB, CIF etc

- What payment terms do you accept?
We accept T/T.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe pictures & photos
Gjcfl-15 Boiler Air Preheater Gap System Air Pipe
US $680-1,360 / Piece
Min. Order: 1 Piece
Gold Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Registered Capital
5000000 RMB
Plant Area
101~500 square meters